WE DEVELOPED HIGHLY EFFICIENT AND ROBUST STRUCTURAL SOLUTIONS
Utilising dual lateral load resisting systems coupled with hybrid pre-stressed in-situ and precast concrete floor systems to achieve exceptional building structural performance with high constructability and cost benefits.
FOR EXCAVATION, AN INNOVATIVE ISLAND CONSTRUCTION METHOD WAS DEVISED
Comprising contiguous bored secant pile walls, deep cement mixed soil and treated perimeter soil berms. The system significantly reduced the quantity and extent of strutting, enabling excavation and superstructure works to proceed concurrently.
AWARDS
- 2017 - BCA Green Mark Platinum
- 2014 - BCA Construction Excellence Award
- 2012 - BCA Construction Excellence Award
- 2011 - BCA Construction Productivity Award
- 2009 - BCA Green Mark – Gold Plus