Hong Kong

Castle Peak A&B Power Stations Reclamation and Jetty

Shanta Pinnacle
October 15, 2019
PNB 118
August 20, 2019

At a Glance

  • LocationCastle Peak
  • CountryHong Kong
  • ClientCastle Peak Power Station Company (Capco)
  • ServicesCivil & Structural, MEP
  • SectorsPorts & Marine, Transportation

Meinhardt was commissioned by Capco, a joint venture of CLP Power and Exxon, to design and supervise construction of the reclamations and seawalls for Asia’s largest coal fired power station complex, with an installed capacity of over 4100MW.

The area of the power station site is 62Ha, of which 35Ha was reclaimed using site won fill. Reclamation filling reaches up to 26m in depth, with the seawalls being the deepest constructed in Hong Kong having a total height between founding level and coping of up to 45m.

Naturally armoured rubble core seawalls designed to meet design  requirements for Hong Kong’s typhoon conditions were founded in water having a depth of about 22m. The site is served by a coal unloading jetty designed by Meinhardt for vessels up to 140,000dwt. The jetty design was recently upgraded by Meinhardt to accept coal vessels of up to 180,000 DWT.

4100MW

One of Asia's Largest Coal Power Stations

35Ha

Built on Reclaimed Land

Specialist Engineering Services

Design and construction of the reclamations and seawalls for Asia’s largest coal fired power station complex